
Project controls and planning
P6 schedules, cost control, 5D quantities and claims.
- Planning and scheduling
- Cost control and earned value
- Quantity surveying and 5D
- Delay analysis and claims
- Technical office
Ascendix Project Solutions is a U.S. engineering services company. We deliver project controls, BIM and construction data for contractors, developers and design firms in the United States and the Gulf, under one accountable contract and to the standards your consultant expects.
What we do
Schedule, cost, model and dashboard share one coding structure, so every report describes the same project. Start with one service and add the rest when they earn their place.

P6 schedules, cost control, 5D quantities and claims.

Revit models, coordination, QA/QC, ISO 19650 and 4D to 7D.

Dashboards, data analysis, ACC, C#, Python and AI.

Drag to rotate
Interactive model
A 12-storey reference model with structure, facade and MEP, built by our team. Switch disciplines, play the 4D sequence, check a clash or see the building as a laser-scan point cloud.
BIM dimensions
Most firms stop at the 3D model. We carry it into time, cost, carbon and operations, so the model keeps paying for itself after design.

Architectural, structural and MEP models built to your standards, federated in Navisworks or Autodesk Construction Cloud, and checked before issue.



Primavera P6 activities linked to model elements, so logistics, crane use and trade sequences can be tested and agreed early.
| Code | Description | Model quantity | Cost | Against budget |
|---|---|---|---|---|
| 03 30 00 | Cast-in-place concrete | 4,860 m3 | $1.17M | -1.8% |
| 05 12 00 | Structural steel framing | 212 t | $0.64M | +3.4% |
| 23 31 00 | HVAC ducts and casings | 9,420 m2 | $0.88M | -0.6% |
| 22 11 16 | Domestic water piping | 6,150 m | $0.31M | +1.1% |
| 26 05 36 | Cable trays | 3,980 m | $0.22M | -2.2% |
| 21 13 13 | Wet-pipe sprinklers | 11,300 m2 | $0.42M | 0.0% |
Quantities taken from the model in Autodesk Takeoff, coded to your cost structure and tracked in Autodesk Cost Management as the design changes.
Early-stage studies in Autodesk Forma for sun, daylight, wind and operational energy, and embodied carbon tracked by building element.
| Asset | Type | Space | Maintenance | Status |
|---|---|---|---|---|
| CH-01 | Air-cooled chiller | Roof plant | Quarterly | Handed over |
| AHU-03 | Air handling unit | L06 plant room | Monthly | Handed over |
| FP-01 | Fire pump set | Basement pump room | Weekly test | Commissioned |
| MDB-1 | Main distribution board | LV room | Annual | Commissioned |
| FCU-4-07 | Fan coil unit | L04 office | Six-monthly | Data pending |
Asset information collected during construction and handed over as COBie and an asset register, with testing and commissioning tracked to the end.
How it looks in practice
Sample screens from the work we deliver: schedules, dashboards, coordination, model checks, code and AI-assisted reviews.
Baselines with a basis of schedule, monthly updates with a narrative, and health checks against the DCMA 14-point assessment.
Cumulative progress, planned against earned
Progress by zone, planned and actual (%)
Activities driving delay
| Activity | Float | Delay |
|---|---|---|
| Core walls L7 to L12 | 0d | 8d |
| Curtain wall L3 | 4d | 6d |
| Chiller delivery | 0d | 5d |
Dashboards built on a proper data model, with earned value, progress by zone and the activities driving delay on one page.
| ID | Status | Level | Element A | Element B | Overlap |
|---|---|---|---|---|---|
| CL-0412 | New | L07 | Supply duct 900x500 | Beam B7-12 | -145 mm |
| CL-0413 | Active | L07 | Chilled water 150 | Cable tray 600 | -60 mm |
| CL-0398 | Reviewed | L06 | Sprinkler main 80 | Duct 600x350 | -35 mm |
| CL-0377 | Resolved | L05 | Drain 100 | Core wall opening | -80 mm |
Federated models, clash tests from an agreed matrix, and issues tracked with owners and due dates until they close.
| Check | Result |
|---|---|
| Naming to the BIM execution plan | Pass |
| Worksets and element ownership | Pass |
| Shared coordinates and survey point | Pass |
| Activity ID populated for 4D | 94% complete |
| Duplicate and overlapping elements | 12 found |
| Views on sheets, unused views removed | Pass |
Every model is checked against the BIM execution plan for health, standards and data before it leaves our hands.
// Revit add-in: find elements with no Activity ID before 4D linking [Transaction(TransactionMode.ReadOnly)] public class CheckActivityIds : IExternalCommand { public Result Execute(ExternalCommandData data, ref string message, ElementSet set) { Document doc = data.Application.ActiveUIDocument.Document; var missing = new FilteredElementCollector(doc) .WhereElementIsNotElementType() .Where(e => e.Category?.HasMaterialQuantities == true) .Where(e => string.IsNullOrEmpty(e.LookupParameter("Activity ID")?.AsString())) .ToList(); TaskDialog.Show("4D check", $"{missing.Count} elements have no Activity ID."); return Result.Succeeded; } }
Revit add-ins in C#, Python on Autodesk Platform Services, and Power Platform workflows that remove manual checks and exports.
| Discipline | Overdue | Oldest |
|---|---|---|
| Structural | 6 | 19d |
| MEP | 5 | 12d |
| Facade | 3 | 8d |
Language models that summarise RFIs, submittals and minutes, with sources shown and a person reviewing every output.
Sample screens use illustrative data.


Scan to BIM
Registered laser scans become as-built models for renovations, MEP retrofits and deviation checks against design.
Selected work
Dashboards, controls and tools built by the Ascendix team.



Client names, project names and locations are withheld for confidentiality. Sample screens use illustrative data.
Why now
Public figures on the market we serve, with sources.
GCC contract awards in 2025, the third-highest year on record.
Source: MEEDKnown, planned and unawarded projects in the GCC pipeline.
Source: MEEDDubai began requiring BIM models with permit applications for larger and specialised buildings.
Source: Autodesk, on the municipality circularYou sign with a U.S. company that holds accountability for the result, with one point of contact.
A lean, distributed delivery team keeps our rates well below typical consultancy rates. The standard of the work does not change.
Schedule, cost, model and dashboard use the same codes, so reports reconcile instead of argue.
How we work
Every proposal states one firm figure per item, the deliverable list and what counts as extra.
Send drawings, a programme or a short description. We reply within two business days with the questions that change the price.
One firm figure per item, the deliverable list, the programme and what counts as extra.
Standards, templates, naming and platform access agreed before production. NDAs signed by everyone on the team.
Work produced by our delivery team, checked by a coordinator and signed off by the delivery lead before you see it.
Native files, PDFs, registers and the record of checks. You own what you paid for.
Insights
Short notes on the problems we see most often. Read all notes
Five parties share ten interfaces. Twenty share 190. Coordination effort grows much faster than headcount.
When cost, schedule and model use different codes, the dashboard reports three different projects.
A model that opens slowly and carries thousands of warnings fails at the worst moment. Check it before every issue.
Practical notes on project controls, BIM coordination and construction data, posted every week.

A drawing list, a programme, an EIR or a short description is enough to start. We reply within two business days with questions or a fixed price.
Or email info@ascendixprojectsolutions.com or call +1 (571) 741-9558