Home / BIM and digital engineering
BIM that builds, coordinates and hands over
Revit models at LOD 300 to 500, coordination that clears clashes before site, model checks before every issue, ISO 19650 information management, and the 4D to 7D work that carries the model into operation.

Revit
BIM modelling at LOD 300 to 500
Architectural, structural and MEP models built in your templates, at the level of information the stage needs, and checked twice before issue.
- Architectural, structural and MEP models at LOD 300, 400 and 500
- Families, templates and shared parameters to your standards
- Models from CAD and PDF drawings
- Shop drawings and drawing registers from the model
- Permit models for authorities that require BIM

| ID | Status | Level | Element A | Element B | Overlap |
|---|---|---|---|---|---|
| CL-0412 | New | L07 | Supply duct 900x500 | Beam B7-12 | -145 mm |
| CL-0413 | Active | L07 | Chilled water 150 | Cable tray 600 | -60 mm |
| CL-0398 | Reviewed | L06 | Sprinkler main 80 | Duct 600x350 | -35 mm |
| CL-0377 | Resolved | L05 | Drain 100 | Core wall opening | -80 mm |
Coordination
BIM coordination and clash detection
Coordination is a process, not a clash report. We federate the models on an agreed cadence, run tests from a clash matrix with tolerances by system, group the results so people can act on them, and chase every issue to closure.
- Federated models in Navisworks and ACC Model Coordination, refreshed weekly
- Clash matrix with tolerances by discipline and system
- Clashes grouped by location and cause, not reported as raw counts
- Coordination meetings with BCF issues, owners and due dates
- Combined services, builders work and MEP shop drawings from the coordinated model
- Riser, plant room and ceiling void coordination

ISO 19650
BIM management and information management
ISO 19650 from the first requirement to handover: who produces what, in what format, by when, and where it lives. Set up before the first drawing, not after the hundredth, and kept current as the project changes.
- Responses to exchange information requirements
- BIM execution plans, MIDP, TIDP and level of information need
- Responsibility matrices and information delivery milestones
- Common data environment setup on Autodesk Construction Cloud
- Naming, status codes, permissions and approval workflows
- Team onboarding, training and monthly BIM performance reports
| Check | Result |
|---|---|
| Naming to the BIM execution plan | Pass |
| Worksets and element ownership | Pass |
| Shared coordinates and survey point | Pass |
| Activity ID populated for 4D | 94% complete |
| Duplicate and overlapping elements | 12 found |
| Views on sheets, unused views removed | Pass |
Quality
BIM QA/QC and model health
A model that opens slowly, carries thousands of warnings or misses its parameters will fail at the worst moment. We check every model against the BIM execution plan before it is issued and report the result, issue by issue.
- Model health: warnings, file size, in-place and unused families, purgeable content
- Standards: naming, worksets, views, sheets and shared coordinates
- Data: required parameters, classification codes and Activity IDs for 4D
- Geometry: levels, grids, duplicates, and LOD and LOIN against the plan
- Automated audits with Revit add-ins, Dynamo and pyRevit
- A QA/QC report and BCF issues with every model issue



4D to 7D
4D sequencing, 5D cost, 6D sustainability and 7D operations
The model keeps paying after design when it carries time, cost, carbon and asset data. We link schedule activities to elements, quantities to cost codes, and asset data to handover.
- 4D: P6 activities linked to model elements in Navisworks TimeLiner
- 5D: quantities coded to your cost structure
- 6D: Autodesk Forma studies for sun, daylight, wind, energy and embodied carbon
- 7D: asset information requirements, COBie and asset registers
- Testing and commissioning tracked system by system
| Asset | Type | Space | Maintenance | Status |
|---|---|---|---|---|
| CH-01 | Air-cooled chiller | Roof plant | Quarterly | Handed over |
| AHU-03 | Air handling unit | L06 plant room | Monthly | Handed over |
| FP-01 | Fire pump set | Basement pump room | Weekly test | Commissioned |
| MDB-1 | Main distribution board | LV room | Annual | Commissioned |
| FCU-4-07 | Fan coil unit | L04 office | Six-monthly | Data pending |
Operations
Asset management, O&M and commissioning
Asset data collected after completion is expensive and incomplete. We define what the facility team needs early, collect it as equipment is installed and check it monthly like any other deliverable.
- Asset information requirements and asset registers
- COBie exports and O&M manuals linked to the model
- Pre-functional, functional and integrated systems test trackers
- Handover packages and digital twin readiness
- Planned maintenance data for the facility team


Point cloud
Scan to BIM, point clouds and surveying
Registered laser scans become as-built models for renovations, retrofits and verification. We process the point cloud, model what matters and report deviations from design.
- Point clouds from your survey partner in E57, RCP and RCS formats
- Registration checks and clean-up in ReCap Pro
- As-built architectural, structural and MEP models
- Deviation reports between scan and design model
- Existing building surveys for MEP retrofits

Virtual design and construction
VDC, AR and VR reviews
Virtual design and construction puts the people who will build the project inside the model first. Logistics, phasing, access and maintenance clearances are agreed before they cost money on site.
- Site logistics, crane and phasing studies
- VR design reviews with headsets
- AR model overlays on tablets during installation
- Maintenance access and clearance reviews
- Visuals and animations for approvals
Sample screens and models on this page use illustrative data prepared by Ascendix.
Software and standards
We work in your platforms and to your standards. Licensed software only.
- Revit
- Navisworks
- AutoCAD
- Autodesk Construction Cloud
- BIM Collaborate Pro
- ACC Model Coordination
- Autodesk Forma
- ReCap Pro
- Dynamo
- pyRevit
- ISO 19650
- IFC
- BCF
- COBie
- LOD and LOIN
- Uniclass
- National BIM Standard-United States
Questions we get asked
Something else? Ask us directly.
What level of development do you model to?
LOD 300 for coordination, LOD 400 for fabrication and shop drawings, and LOD 500 or as-built for handover, as the contract requires.
What does your BIM QA/QC check?
Model health, standards compliance, data completeness and geometry against the BIM execution plan. Every issued model comes with a QA/QC report and the open issues.
How often do you run coordination?
Usually weekly, on an agreed exchange date, with a coordination meeting and a BCF issue list after each run.
How do you price BIM work?
Per square foot or square metre for modelling and coordination and per drawing for shop drawings, with one firm figure per item.

Send us a scope
A drawing list, a programme, an EIR or a short description is enough to start. We reply within two business days with questions or a fixed price.