Project controls that hold up on site and in a dispute
Planning, cost and change control from one coding structure: schedules your consultant will approve, earned value your board can act on, and records strong enough for an extension of time.
Primavera P6
Planning and scheduling
A programme is only useful if the site recognises it. We build schedules from the work breakdown down, tie every activity to cost and model codes, and keep them current with a narrative each month.
- WBS and activity coding tied to cost and the model
- Baseline programmes with a basis of schedule
- Monthly updates with a narrative of what moved and why
- Schedule health checks against the DCMA 14-point assessment
- Look-aheads, resource loading and constraint tracking
Cumulative progress, planned against earned
Progress by zone, planned and actual (%)
Activities driving delay
| Activity | Float | Delay |
|---|---|---|
| Core walls L7 to L12 | 0d | 8d |
| Curtain wall L3 | 4d | 6d |
| Chiller delivery | 0d | 5d |
Earned value
Cost control and earned value
Earned value shows whether money and time are being converted into progress. We set up the budget structure, measure progress honestly, and report CPI, SPI and the estimate at completion every month.
- Budgets and cost breakdown structures
- BAC, EV, AC, CPI, SPI and EAC calculated from one data model
- Cost-to-complete and cash flow forecasts
- Change control with a live register
- Monthly reports for project and executive audiences
| Code | Description | Model quantity | Cost | Against budget |
|---|---|---|---|---|
| 03 30 00 | Cast-in-place concrete | 4,860 m3 | $1.17M | -1.8% |
| 05 12 00 | Structural steel framing | 212 t | $0.64M | +3.4% |
| 23 31 00 | HVAC ducts and casings | 9,420 m2 | $0.88M | -0.6% |
| 22 11 16 | Domestic water piping | 6,150 m | $0.31M | +1.1% |
| 26 05 36 | Cable trays | 3,980 m | $0.22M | -2.2% |
| 21 13 13 | Wet-pipe sprinklers | 11,300 m2 | $0.42M | 0.0% |
5D cost
Quantity surveying and 5D cost
Quantities taken from the model are faster and traceable, provided the model was built to be measured. We agree the modelling rules with your quantity surveyor first, then take off, code and price.
- Model-based takeoff in Autodesk Takeoff
- Bills of quantities to the agreed measurement method
- Budgets, commitments and change orders in Autodesk Cost Management
- Monthly valuations and variation pricing
- MasterFormat and Uniclass coding
Claims
Delay analysis and construction claims
Most claims are lost on records, not on merit. We keep the records while the work happens and prepare the analysis when it is needed, following recognised methods such as the SCL Delay and Disruption Protocol.
- Notice logs checked against contract time bars
- Time impact, windows and as-planned against as-built analysis
- Extension of time submissions
- Prolongation and disruption cost assessment
- Support to your counsel and experts. We do not give legal advice.
| Ref | Subject | Discipline | Status | Due |
|---|---|---|---|---|
| RFI-118 | Slab edge detail at L09 balcony | Structural | Open | 3 days |
| SUB-204 | Chiller shop drawings, rev B | Mechanical | In review | 6 days |
| ISS-331 | Fire damper access panel missing | MEP | Assigned | 2 days |
| RFI-112 | Curtain wall bracket spacing | Facade | Closed | Closed |
Construction technical office
Technical office and project support
Registers decide how fast a project moves. Our remote technical office runs document control, RFIs, submittals and shop drawing registers in your systems, for as long as the job needs it.
- Document control and transmittals
- RFI, submittal and shop drawing registers
- Material submittals, method statements and inspection plans
- Meeting minutes and action logs
- PMO setup, KPI frameworks and business analysis
Sample screens and models on this page use illustrative data prepared by Ascendix.
Software and standards
We work in your platforms and to your standards. Licensed software only.
- Primavera P6
- Microsoft Project
- Autodesk Takeoff
- Autodesk Cost Management
- Autodesk Build
- Power BI
- Excel and Power Query
- DCMA 14-point assessment
- AACE recommended practices
- SCL Delay and Disruption Protocol
- FIDIC
- AIA contract documents
- CSI MasterFormat
- Uniclass
Questions we get asked
Something else? Ask us directly.
Do you work in our Primavera P6 database?
Yes. We work in your P6 environment or exchange .xer files, using your calendars, codes and layouts.
How do you price project controls?
Usually as a monthly retainer per project with named people, or a fixed fee to set up controls that your team then runs.
Can you review a programme prepared by someone else?
Yes. A schedule health check scores the programme against recognised quality checks and lists the fixes that matter most.
Do you provide legal advice on claims?
No. We prepare records, analysis and submissions and support your counsel and experts.